Set up once, then it just runs

Four steps, agreed before the first collection.

Start from what the site produces

A collection is set up from a look at what the site produces: the streams, the containers, the schedule and the records. Once it is agreed, it runs to that schedule, and the paperwork for each load is kept with it.

Permits, Technically Competent Manager cover and regulator matters sit with IWS Permitting & Compliance, part of the same Group.

  1. 01

    Walk the site

    Identify the waste streams and where they arise.

  2. 02

    Choose the containers

    Bins, skips, roll-on-off or compaction, by stream.

  3. 03

    Agree the schedule

    Fixed days or on call, with access arrangements.

  4. 04

    Keep the records

    Transfer notes, consignment notes and the digital waste tracking entry.

Tell us what the site produces

Streams, rough volumes and the postcode are enough to start.

Arrange a collection Permits and compliance
HelpClick here, and we will do the rest.