Set up once, then it just runs
Four steps, agreed before the first collection.
Start from what the site produces
A collection is set up from a look at what the site produces: the streams, the containers, the schedule and the records. Once it is agreed, it runs to that schedule, and the paperwork for each load is kept with it.
Permits, Technically Competent Manager cover and regulator matters sit with IWS Permitting & Compliance, part of the same Group.
- 01
Walk the site
Identify the waste streams and where they arise.
- 02
Choose the containers
Bins, skips, roll-on-off or compaction, by stream.
- 03
Agree the schedule
Fixed days or on call, with access arrangements.
- 04
Keep the records
Transfer notes, consignment notes and the digital waste tracking entry.
Tell us what the site produces
Streams, rough volumes and the postcode are enough to start.
